Test what the system can get wrong.
A good average score can hide the one failure your operation cannot accept. Evaluation needs to preserve that distinction.
Discuss the architecture01The design question
Fluency and authority belong on different scorecards.
A summary can be mostly complete and still be useful. A workflow that writes after rejection has failed a control, regardless of how many other cases it passed. We separate graded quality from conditions that must stop a release.
Reference design. Reusable NAV infrastructure is under development.
02Key decisions
An evaluation case needs a reason to exist.
An ordinary task
Establish what a correct result looks like and which evidence supports it. This is the baseline for assessing changes.
A justified stop
Missing information, conflicting documents or expired authority may require the system to ask for review instead of completing the task.
An interrupted action
Exercise provider timeouts, duplicate events and uncertain writes. Check both recovery behavior and what the operator sees.
03In practice
Evaluation & Monitoring in practice
Test the boundary cases
Include missing data, stale records, contradictory documents, tool outages, rejected approvals, and duplicate deliveries. Consequential controls should be tested as explicit pass or fail conditions rather than averaged into a quality score.
Observe without overcollecting
A trace should show enough to diagnose a run while respecting sensitive-data boundaries. Prefer identifiers and structured state changes to unrestricted copies of prompts, documents, or personal information.
Make release a decision
An evaluation report should state the dataset version, known gaps, unresolved failures, and the authority proposed for the workflow. Passing an offline test supports a bounded pilot; it does not establish universal safety or future performance.
04Scope
Areas of work
- Evaluation datasets
- Failure scenarios
- Regression checks
- Run traces
- Operational alerts
- Release criteria
05A common question
How does monitoring differ from pre-release evaluation?
Evaluation exercises defined cases before a change. Monitoring observes real operating conditions after release. The two connect when an observed failure becomes a versioned test case for the next change.