Sculpting the future of the Caribbean

TechnologyVentures
Skip to content
NAV TechnologyInsightsEvaluating AI workflows before deployment

Evaluation · 5 min read

Evaluating AI workflows before deployment

Test evidence, permissions, execution, and recovery alongside the quality of the model's answer.

In this perspective

01Evaluate the workflow you intend to operate02Build cases from actual decisions03Separate quality from control failures04Exercise interruption and recovery05Turn the results into a release decision
01

Evaluate the workflow you intend to operate

An answer-quality test does not establish whether an AI workflow can safely use a tool, respect an access boundary, or recover from an unavailable provider. The deployed behavior includes retrieval, validation, approval, writes, and the interface used by an operator. Evaluate that complete path at the level of authority you propose to grant it.

Begin with a task contract. Specify the inputs the system may use, the expected result, the sources required to support it, and the actions it may take. Identify the failure consequences with the operating team. A drafting assistant and an agent authorized to change records need different release criteria even when they use the same model.

02

Build cases from actual decisions

Create a representative set of tasks with expected outcomes and the evidence a reviewer would need. Use authorized or synthetic records, minimize sensitive content, and version the dataset. Include ordinary cases, difficult but valid cases, and cases where the correct response is to stop or ask for clarification.

For a document intake workflow, examples could include a complete request, a missing identifier, contradictory attachments, an unreadable page, and an instruction embedded inside a document that attempts to change the agent's behavior. These are illustrative evaluation scenarios. Each should have a stated reason for inclusion and an observable expected outcome.

Illustrative diagram
  1. 01Representative cases
  2. 02Quality measure
  3. 03Control failure
Quality scores and control failures need separate release decisions.
03

Separate quality from control failures

Some outcomes can be scored on a scale: summary completeness, relevance, or reviewer effort. Other outcomes should be explicit failures: access to an unauthorized record, execution after a rejected approval, or a duplicate write. Combining all of them into one average can hide a consequential control problem behind many easy successes.

Evaluate evidence separately from fluency. Does the output cite the right source? Does the cited passage support the statement? Does the workflow acknowledge missing or stale information? A polished explanation is not proof that the underlying result is correct. Where calculations are involved, compare them against a reproducible deterministic baseline.

04

Exercise interruption and recovery

Test unavailable tools, timeouts, malformed responses, duplicate events, expired approvals, and changed source records. Check what the user sees at each point. A system should distinguish a confirmed failure from an unknown outcome and offer a recovery action that preserves completed work.

Capture a structured trace with identifiers, states, validation results, and tool outcomes. Avoid unrestricted logging of private documents or inquiry fields. The trace should explain why a run stopped and what an operator can do next. Repeat selected cases after configuration, model, or provider changes so the team can see which behavior changed.

05

Turn the results into a release decision

An evaluation report should identify its dataset version, system configuration, measured results, known gaps, and unresolved failures. State the proposed operating boundary clearly: which users, tasks, tools, and authority are included in the pilot. A narrow release can generate evidence for a later decision without implying the system is ready for every use.

Choose operational monitoring that follows the same contract. Review exception volume, evidence failures, rejected proposals, tool errors, and recovery effort. Decide in advance which conditions pause execution and who responds. Evaluation continues after deployment because inputs and dependencies change; it gives the team a repeatable way to decide whether the workflow should retain, lose, or gain authority.

Original NAV Technology perspective. Examples illustrate the engineering decisions discussed.

Keep reading

More perspectives

All perspectives

Agent systems · 5 min read

Designing human approval into agents

Read the perspective

Systems engineering · 5 min read

Integrating legacy systems incrementally

Read the perspective

Your next chapter

Build what
comes next.

Tell us what you’re solving. We’ll help design the technology to get you there.

Talk to our team
NAV Collective

Ventures

PeyeliPREDISÒLKonekWOUTMediOS
CareCircleVERTIERMisty EssenceKwasansPULLOVR
View all 11 ventures→

About

StudioTeamImpact
CollaborateInvestContact

Follow

SÒL · Instagram @joinsolappKonek · Instagram @hellokonekWOUT · Instagram @trywoutVERTIER · Instagram @vertiervaultMisty Essence · Instagram @shopmistyessenceKwasans · Instagram @kwasans.co
@joinsolapp@hellokonek@trywout@vertiervault@shopmistyessence@kwasans.co

Connect

Follow us on InstagramSend us an emailPartner with us

Newsletter

Put your email down. Be first in line for the next opportunity.

© 2026 NAV Collective. Built for our community.

Privacy policyTerms of use